About usContact Us map EnglishEnglish Top Title: Hello! Welcome to the website of Guangdong Immetech Technology Co., LTD!
Serve Products to the World, Build Molds to the GlobeFocus on the development and manufacture of high-precision molds
Hotline:189-3826-9727
Location: homepage > Immetech Strength > Quality Strength

Online consultation

189-3826-9727

Immetech’s quality strength

作者:小编Time:2023-04-06 次浏览

Information Summary:

01 Quality capacity Immetech has a perfect quality control system to ensure that all the output products and molds are beyond customer demand. Our company has passed the ISO 13485


01 Quality capacity

 

Immetech has a perfect quality control system to ensure that all the output products and molds are beyond customer demand. Our company has passed the ISO 13485 medical device quality management system certification and IATF 16949 automotive industry quality management system.

 

Combined with the efficient application of quality technical tool process confirmation, APQP product advance planning, FMEA potential failure mode analysis, SPC statistical process control, MSA measurement system analysis, PPAP production inspection approval procedures, to avoid or reduce the risk of potential failure, shorten the cycle time and resource waste.

 

Synchronously reduce the dependence on routine inspection, through timed observation and systematic measurement methods instead of a large number of inspection and verification work, truly achieve fast, accurate and efficient quality assurance and meet customer requirements.

三次元和二次元.jpg

 

02 Quality control


We continue to improve our quality management level. Advanced 3D CMM Hexagon coordinate measurement and 2.5D coordinate measurement, EROWA whole-process mold manufacturing control system, to ensure that every part and product production is inspected and tested in strict accordance with the quality control system, accuracy to meet and exceed the design requirements.

 

Our quality control system can detect potential product defects early and take necessary preventive and corrective actions to protect your project.



1.png


【Recommendation】

  • Previous:No
  • Next:No
Return to List This article tags: